The work was carried out to facilitate the movement of residents in this direction, the ministry reported.

The length of road is 15 kilometers with width of six meters. The ministry carried out major repairs on the bridge passing through a river. Dredging on the river was carried out to prevent  destruction of roads as a result of floods and other natural disasters.

The ministry also plans to reconstruct the road in the direction of Danachi and Ashagi Chardaglar villages.


/Trend/