The funds allocated by the U.S. Government worth $1 million were completely spent for renovation of third floor of the building at the level of BSL-2.

The works were done in 2007. The Department will consist of 11 rooms. To ensure power supply the building is equipped with a generator, insenerator was built for utilization emissions.

The laboratory is equipped with an electronic system for Disease Control, server solutions and fire safety system. Trainings are organized for the laboratory staff.


/Trend/