The traffic was restored at 10:08 as soon as the train that held up in the tunnel came out, the Baku Metro said.

Chief engineer Elbrus Muradov said the train stopped at a tunnel in Ganjlik subway due to a breakdown. He said the problem was addressed in 10-12 minutes.

/APA/