Under CERA estimates, oil production from this bloc of fields is 850,000 barrels per day.
The PSA contract on the Azeri-Chirag-Guneshli field was signed in 1994. The total investment is estimated at $20 billion. The recoverable oil reserves in the fields operated by the BP are estimated at one billion barrels. Azeri Light oil produced from Azeri-Chirag-Guneshli fields is delivered to the Turkish Ceyhan port via the Baku-Tbilisi-Ceyhan pipeline. Oil from this field is also transported via the Baku-Supsa pipeline.
First place on the list of the largest oil fields is held by Gavar field in Saudi Arabia with a daily production of five million barrels. The second is the Burgan field in Kuwait with a daily production of 1.2 million barrels.
/Trend Capital/
Azerbaijani oil field third in CERA ranking of world's 20 largest oil fields
Azerbaijan's Azeri-Chirag-Guneshli field took third place in a ranking of the world's 20 largest oil fields set up by the American Consulting Association CERA (Cambridge Energy Research Associates).

